Wood-based Panels

Today, beautiful furniture can be made not only of wood. For its production and use wooden boards. The use of this material is distributed in many modern industries. This is primarily associated with its high performance qualities. Virtually all wood stoves are the sheet material obtained by molding with subsequent drying is used mass pre- impregnated with synthetic polymers. To improve the water resistance of products in this mixture is added paraffin wax or other substances with similar properties. They are made of wood unbusinesslike, croaker, reiki, sawdust and shavings, wood chips, paper recycling, as well as flax and hemp chaff, corn stalks, sunflower. This product allows efficient use of waste products.

In the construction industry for heat and acoustic insulation products used in the volumetric weight of 250-350 kg/m3. Application of hdf plates much faster finishing. Manufacture them is composed of the following operations: preparation of wood chips and grinding on the fiber; impregnated fibreboard mass communication; molding plates, drying them, trimming. Dimensions and main indicators of physical and mechanical properties of these products are set appropriate standards. hdf boards used as a carrier element for laminate and other floor coverings.

They are used in furniture manufacturing as the rear wall of furniture and bed base, as well as for other purposes. Raw materials for production of this products are only environmentally friendly materials. They have been thoroughly tested and only allowed to use. Full heat and sound insulation of walls, partitions, ceilings intercommunication residential buildings, roofs and floors of industrial buildings can provide particle boards. They are produced by hot pressing of wood chips, soaked in synthetic polymers. During hot pressing, liquid polymer hardens, gluing the chips into a monolithic mass. Depending on the degree of compaction in the pressing plate can be obtained for various volume weight. In most cases, apply light particle boards with a bulk density of 250-400 kg/m3. Their length generally does not exceed 360 cm, width 120-180 cm, thickness of 13 mm to 25 mm. To date, these insulation products have a very high level of demand. Attach them to walls and ceilings with galvanized nails or glued mastic.

The Outer

Deck construction should be capable of discharging any principal or subsidiary machinery of the engine room. To do this, shipbuilding should include, if you can not make the necessary cuts in the deck, which in the mine provides removable parts. Fuel reserves are located in the side and bottom, as well as high transverse cisterns (deep tanks). Keep heavy grades of fuel with a positive pour in Bottom tanks is not recommended. Tank fuel supply should be separated by cofferdams from residential, office and refrigerated rooms. Cofferdams also shared the tank of oil and fuel from the tanks of fresh water.

Tanks supply of oil, usually located outside the double bottom and separate them from the outer skin. In some cases, they carry loose to allow the descent of sludge. Example of the main engine of Defense – in Fig. 1. Requirements of the Register of the ussr. The basic requirements for ensuring the security service of installation, is to limit the distance between the machinery and equipment in the main Fig. 1. Placing the main engine in mo.

passages: the width of not less than 600 and not less than 2000 mm. Also sets the width of the space in front of electrical boards 800 (when the length of the shield less than 3 m) and 1000 mm (length of the shield 3 m). Passages of boards in width to be 600 and 800 mm. Space behind the shields should be fenced and equipped with doors. With a length of boards more than 3 m outputs of the space behind the shields should be placed at opposite ends. Piping over, and for shields is not allowed. For steam boilers the distance from the skin (surface insulation) to the walls of tanks of fuel and oil shall not be less than 600 mm. When placing the boilers in the intermediate Palu-bang or the space underneath the platform hedged coaming height of at least 200 mm. Basing and storm retention should allow thermal expansion. Placement of fuel under steam boilers are prohibited. The height of the second bottom to the shell of the boiler shall be not less than 750 mm. Fuel and oil tanks, as a rule, should not be placed on the bridges, the main machinery, boilers, vapor pipe and chimney of the power equipment and main machinery control position. Each spp should be equipped with various positions of management. Local control stations are placed in close proximity to machinery and other equipment taking into account ease of use. Depending on the type of installation, and its degree of automation in the spp may be in addition to local remote offices and the central control unit (CPU). cpa, as a rule, located in a separate soundproof room near the main engine and should provide opportunities for its review.

How To Create Your Own Website

Where can I make a site? Can be very elaborate Web site on a standard template and place it in a virtual network. Why pay money for a simple resource that you may well run on their own? On the Internet there is array of types of templates that can be purchased for a fee, and download for free. Type in your search engine key phrase: "Download Template". You get a lot of options on any color patterns and taste. Now it remains for small – to arrange site content, so-called content of the site.

Choose a unique domain name and publish a resource on the Internet. With self-development networking project essential to its continued success is the choice of topics for the site. Enthusiastic coin collector does not make sense to create a site on space technologies, and professional web designer – about the latest developments in the field construction business. Online resource, created on the topic is not interesting to its creator, doomed to failure. You can order your own network share in web-design studio, the benefit of those on the Internet – a great many. In professional studio offers you choose design your own website (web design) of the samples submitted: backgrounds, fonts, buttons, music, animation and so forth.

Literacy rate is the content for the site based on information provided by you. Successfully accommodated on the web pages of your favorite photos and pictures. For a fee, will pick a suitable domain name and publish your project in a virtual network. Here, an important factor in the successful creation of the website is professional musician. To do this, before your order, you must read the portfolio of the customer, to clarify its legal address and contact information. and required – to conclude a contract for services. If you have any disputes with a web-studio artist, this document will be crucial. You can order the creation of the site to an individual. That is man alone who takes designing websites to order. The cost of such work is much less than the cost of creating the site in a professional studio web design. What is all the merits of such an order and end. As a rule, private entrepreneurs promise to create a unique web design for the site, easy content management system, a functional system of navigation / usability / fast deadlines, and so on. On the typography and bringing the network share to a single artistic image, the psychological perception of color, and text that lurid banners and flashy buttons do not paint to create a site and they have no representation. Naturally, owner-driver owner-driver alike. The Internet, of course, there are unique individuals, capable of a good online resource in the short term. But is there any guarantee that such a unique talent to meet for you? Within major network project, each participant must do his own job. Web designer – to create sketches of the project, a maker – convert a sketch to html, programmer – to develop software, the author – to write unique content. Each of the Web developers should be professional in your field. In any case, the option of creating your own network resource is yours.

Organization Folder

Issues discussed in the article are so specific, that is unlikely to be interested in a man is not working in this program. But the practice of correspondence, both novice users of these tools and with the general, people are already sophisticated and to acquire some expertise in operating three-dimensional world suggests that this question is very nasuschen and interesting. Organization of libraries in this program and facilities management, the proposed developer, leave much to be desired. Board Meeting on Ineta also be called constructive and problem-solving. So I want to say that I'll be the first to formulate a solution writing.

Please do not judge me harshly, and not kick your feet, if a way out of this problem, you already know or you have thought of this, as I write. For I repeat that I made that never read. A separate information on device folder 'Runtime' and the ability to rename folders, programs believe tip for your decisions. In general, when the amount of installed libraries in a couple of gigabytes of such questions may not excite, but when the folder established models proliferate, and their volume reaches gigabytes that way forty or fifty, you start to understand clearly that the idea to throw everything into one pile, was, to put it mildly, a little constructive and too reckless. Say that with a large library it becomes difficult to understand – it's nothing to say. One only scrolling in the 'Pose' can last more than a minute and bring to a white heat anyone.

Hydraulic Calculations

A substantial portion of the same data needed for solving different tasks by different programs. A simple example – the length of any particular section of pipeline thermal network. This value should be: for the calculation of hydraulic calculation of heat loss, accounting for depreciation accounting for accounting and planning of planning preventive maintenance, to determine the buffer zone, logging and dispatching orders etc. If the solution of each of these tasks using a separate program (and it is, usually is), then the length of the site is stored in a data format of each of these programs – that is, many times, how many programs use this value. Change the value of the length of a site-specific pipeline within the data set one of the programs does not affect this value in all the other data sets. It is clear that very soon there comes a complete mismatch of data on the same object in different sets, and oversee this process is quite impossible. This kind of "multipurpose" data about objects of any of engineering communications – at least hundreds, perhaps thousands. In such circumstances, meaningless to talk about any reliability data arrays.

Based on information received technical and management solutions. Decisions adopted on the basis of erroneous or inaccurate information, as generally ineffective, but that is much worse – in a complex engineering system, they could be disastrous. The same, of course, applies to "paper" information. Information about the same objects stored "in Wardrobe different services businesses tend to suffer even greater degree of mismatch.

The Forex

Night view Asia / Europe USD on a strong start, but fell in the European session The level of support and resistance remained as expected, English and German data added pressure of the day’s events All times EASTERN (-5 GMT) 9:00 a.m. USD S & P / CS Composite-20 HPI y / y 10:00 a.m. USD CB Consumer Confidence 10:00 a.m.

USD Richmond Manufacturing Index By Wednesday All times EASTERN (-5 GMT) 10:30 am USD Crude Oil Inventories 2:15 pm USD FOMC Statement 2:15 pm USD interest rates Also WEF – Annual session of the dollar remained on the defensive this morning, while losing ground. Despite a strong start, the greenback continued to lose ground, as noted on Monday, at the start of the European session gains made by the USD vanished. Against the GBP, the American currency is remained at the 1.3900 in Tokyo, and recorded in the 1.3928 minimum. The pair maintained their level of S / R against the GBP and improved towards the European session, the British data, namely the UK CBI, exceeded expectations, and next to the German IFO after publication, self improvement and reached the area of 1.4100. Some central banks bought euros, which continued to advance against Cable. The cable reached highs in the 1.4245, the volume of transactions was low in Asia as the Chinese new year, but improved in the European session.